Developing of Reliability-Centered Maintenance Methodology in Second Power Plant of South Baghdad
Developing of Reliability-Centered Maintenance Methodology in Second Power Plant of South Baghdad

Amjad B. Abdulghafour; Ammar I. Abdulwahed

Volume 36, 8A , August 2018, , Page 842-852

https://doi.org/10.30684/etj.36.8A.3

Abstract
  Electric equipments of power station must be operated in the state of high reliability with its responsibility in the seamless power supply. Maintenance is one of the important and ...  Read More ...
Developing a Branch and Bound Algorithm for Cell Formation and Group Scheduling
Developing a Branch and Bound Algorithm for Cell Formation and Group Scheduling

Amjad B. Abdulghafour; Dhulfiqar H. Dhayef

Volume 36, 5A , May 2018, , Page 555-563

https://doi.org/10.30684/etj.36.5A.11

Abstract
  Scheduling models for groups of parts have become more widely used in the industrial companies because of intensification of competition among them to get optimization in the delivery ...  Read More ...